Modernisation of the process water treatment plant at the Prunéřov power station

Client: ČEZ, a.s., Praha, Elektrárna Prunéřov

Equipment and performance:

Modernisation of the process water treatment plant at the Prunéřov power station
Water treatment plant

  • Clarification unit and dosing of chemicals - 150 m3/h
  • Filtration unit (sand filters, pumps, blowers) - 150 m3/h
  • Reverse osmosis unit - 80 m3/h
  • Demineralization unit (cation filters, decarbonator, anion filters, mixed bed filters, regeneration station, pumps) - 100 m3/h
  • Softening
  • Storage tanks of demiwater
  • Storage of chemicals for regeneration of ion exchange resins (HCl, NaOH – tanks, pumps)
  • Storage tanks of waste water
  • - Cooling feed water treatment
  • - Clarification unit and dosing of chemicals - 2x 750 m3/h

 

In operation from: 10/2016