Potable water treatment plant - Tagtabazar, Turkmenistan
Client: Eagle Property Investment L.P.
Equipment and performance:
Potable water treatment plant in Tagtabazar
- 625 m3 / h
- Design, supply, installation
- 2 pcs pumping stations, Q = 324 m3/h and Q = 384 m3/h with accumulation 3 x 1 000 m3
- Pipeline of water supply for WTP with length more than 7 000 m
- Sand filtration 750 m3/h on pressure filters
- Ionex filtration 375 m3/h
- Chemical preparation and chemical dosing
- Accumulation of drinking water (4 x 1 000 m3)
- Pumping station of drinking water
- Electrotechnical part, measurement, regulation, control system, cabling
In operation from 01/2019