Potable water treatment plant - Tagtabazar, Turkmenistan 

Client: Eagle Property Investment L.P.

Equipment and performance:

Potable water treatment plant in Tagtabazar

  • 625 m3 / h
  • Design, supply, installation
  • 2 pcs pumping stations, Q = 324 m3/h and Q = 384 m3/h with accumulation 3 x 1 000 m3
  • Pipeline of water supply for WTP with length more than 7 000 m
  • Sand filtration 750 m3/h on pressure filters
  • Ionex filtration 375 m3/h
  • Chemical preparation and chemical dosing
  • Accumulation of drinking water (4 x 1 000 m3)
  • Pumping station of drinking water
  • Electrotechnical part, measurement, regulation, control system, cabling

In operation from 01/2019


Back