![Zelivka1.jpg](/files/dl/1/734/Zelivka1_resized128x128.jpg)
Modernization of the Želivka Water Treatment Plant - Czech Republic
Client: Voda Želivka a.s.
Equipment and performance: Delivery and installation of the drainage system...
![BP2a.jpg](/files/dl/1/625/BP2a_resized128x128.jpg)
Potable water treatment plant - Bílý Potok, Czech Republic
Client: VHS Stavby, a.s. / Final client: Frýdlantská vodárenská společnost, a.s.
Equipment and performance: Potable water treatment plant Bílý Potok, Czech Republic...
![20180605_074714.jpg](/files/dl/1/571/20180605_074714_resized128x128.jpg)
Potable water treatment plant - Tagtabazar, Turkmenistan
Client: Eagle Property Investment L.P.
Equipment and performance: Potable water treatment plant, 625 m3/h...
Reconstruction and modernization of DWTP Plzeň
Customer: Metrostav, a.s., Praha
Equipment and performance: Reconstruction and modernization of DWTP Plzeň, 3 600 m3/h...
![WP_20160407_10_45_13_Pro_LI.jpg](/files/dl/1/497/WP_20160407_10_45_13_Pro_LI_resized128x128.jpg)
DWTP Souš – flotation
Client: Severočeská vodárenská společnost a.s., Teplice
Equipment and performance: DWTP Souš – flotation, 774 m3/h...
![0315-uv-mostiste.jpg](/files/dl/1/172/0315-uv-mostiste_resized128x128.jpg)
ARKO - Drinking Water Treatment Plant – Mostiště
Client: ARKO TECHNOLOGY, a.s., Brno
Equipment and performance: Drinking Water Treatment Plant – Mostiště / removal of raw water pipeline, 220 l/s...
![309-uv-jirkov1.jpg](/files/dl/1/173/309-uv-jirkov1_resized128x128.jpg)
Reconstruction of drinking water treatment plant Jirkov
Client: INZET, s.r.o., HST Hydrosystémy s.r.o. / Final client: Severočeská vodárenská společnost, a.s.
Equipment and performance: Dosing of carbon dioxide (machine part) / Dosing of lime (machine part)
![274-hajska1.jpg](/files/dl/1/174/274-hajska1_resized128x128.jpg)
WTP Hajská
Client: ENVI-PUR, s.r.o., Praha
Equipment and performance: 4 pcs. sand filters - 4 x 50 m3/h
![262-krusovice.jpg](/files/dl/1/176/262-krusovice_resized128x128.jpg)
Krušovice - Sand replacement
Client: Královský pivovar Krušovice a.s.
Equipment and performance: Sand replacement
![232-uv-sous.jpg](/files/dl/1/175/232-uv-sous_resized128x128.jpg)
SMP CONSTRUCTION - Reconstruction of drinking water treatment plant Souš
Client: SMP CONSTRUCTION, a.s.
Equipment and performance: Reconstruction of drinking water treatment plant Souš - 684 m3/h (190 l/s) / dosing of coagulant...