SMP - Reconstruction of Drinking water supply system – ISPA Hradiště
Client: SMP CONSTRUCTION, a.s.
Final client: Severočeská vodárenská společnost a.s.
Equipment and performance:
Reconstruction of Drinking water supply system – ISPA Hradiště, 4 050 m3/h (1 125 l/s)homogenization
- reaction tank
- treated water accumulation
- potassium permanganate dosing
- sludge treatment
- switching station
In operation from 5/2006