SMP - Reconstruction of Drinking water supply system – ISPA Hradiště

Client: SMP CONSTRUCTION, a.s.

Final client: Severočeská vodárenská společnost a.s.

Equipment and performance:

Reconstruction of Drinking water supply system – ISPA Hradiště, 4 050 m3/h (1 125 l/s)homogenization

  • reaction tank
  • treated water accumulation
  • potassium permanganate dosing
  • sludge treatment
  • switching station

In operation from 5/2006


Back