Modernisation of the process water treatment plant at the Prunéřov power station
Client: ČEZ, a.s., Praha, Elektrárna Prunéřov
Equipment and performance: Clarification unit and dosing of chemicals - 150 m3/h / Filtration unit (sand filters, pumps, blowers)...
Demineralization station - Synthesia, Pardubice - Semtín, Czech Republic
Client: Synthesia, a.s.
Equipment and performance: Reconstruction of demistation ZL10, 1 x 200 m3/h...
Yunus Emre 2 x 145 MWe CFPP
Client: Vítkovice Power Engineering a.s., Ostrava
Equipment and performance: OU 13 – Chemical water treatment plant, 2 x 20 m3/h / OU 14 – Dosing of ammonia
Počerady 880MWe Power Plant
Client: ČEZ, a.s., Praha, elektrárna Počerad
Equipment and performance: Combined cycle power at Počerady / 880MWe / Power Plant...
PBS - CWTP Domoradice
Client: První brněnská strojírna, a.s., Brno
Equipment and performance: CWTP Domoradice / raw water treatment, 11 m3/h / condenzate polishing, 15 m3/h...
Tp Trmice - Sand filters of clarified water
Client: SES Bohemia Engineering, a.s., Praha / Konečný zákazník: Teplárna Trmice
Equipment and performance: Sand filters of clarified water, 350 m3/h
ŠPI - Complex reconstruction of Tušimice II power station - water management
Client: ŠKODA PRAHA Invest s.r.o. / Final client: ČEZ, a.s., Praha
Equipment and performance: Complex reconstruction of Tušimice II power station / water management...
Alpiq Kladno - Renovation of lower drainage
Client: Alpiq Generation CZ, s.r.o., Kladno
Equipment and performance: Renovation of lower drainage / filter average 2500 mm / capacity - 200 m3/h
Tp Tábor - Mixed-bed filter
Client: Teplárna Tábor, a.s.
Equipment and performance: Mixed-bed filter - capacity 80 m3/h
Tp Plzeň - Demineralization station No.6
Client: Plzeňská teplárenská, a.s., Plzeň
Equipment and performance: Demineralization station No.6, capacity 130 m3/h