United Energy - Reconstruction of sand beds and jets
Client: United Energy, a.s., Most – Komořany
Equipment and performance: 3 pcs. of sand filters of clarification water – reconstruction of sand beds and jets, 3x 40 m3/h
Tp Brno - Reconstruction of chemical sewer system and waste water drains
Client: Teplárny Brno, a.s., Brno
Equipment and performance: Reconstruction of chemical sewer system and waste water drains, 12 pcs....
IMOS Zlín - TOT - Reconstruction of chemical storage
Client: IMOS Zlín, s.r.o. / Final client: Teplárna Otrokovice, a.s.
Equipment and performance: Reconstruction of chemical storage / reconstruction of HCl storage tanks, 2 x 25 m3...
Mittal Steel - WWTP Ostravice
Client: Mittal Steel Ostrava , a.s.
Equipment and performance: WWTP Ostravice / reconstruction of closing slide / reconstruction - dosing Ca (OH)2,Fe2(SO4)3...
SMP - Reconstruction of Drinking water supply system – ISPA Hradiště
Client: SMP CONSTRUCTION, a.s. / Final client: Severočeská vodárenská společnost a.s.
Equipment and performance: Reconstruction of Drinking water supply system – ISPA Hradiště, 4 050 m3/h (1 125 l/s)...
Chladící věže Praha - Water treatment of cooling circuit
Client: Chladící věže Praha, a.s. / Final client: Spolana Neratovice, a.s.
Equipment and performance: Water treatment of cooling circuit / softening, 8 m3/h / chemical dosing station
ČEZ - ETI - Waste water recycling for mixing with fly-ash
Client: ČEZ, a.s. Elektrárna Tisová
Equipment and performance: Waste water recycling for mixing with fly-ash...
Tp Plzeň - Standby pipe for demineralization water
Client: Plzeňská teplárenská, a.s., Plzeň
Equipment and performance: Standby pipe for demineralization water, 200 m3/h
Tp Přerov - Reconstruction of CWTP
Client: Dalkia Česká republika, a.s., Divize Přerov
Equipment and performance: Reconstruction of CWTP / clarification, 200 m3/h / sludge dewatering...
Earth Resources - Aeration of decarbonisation water
Client: Earth Resources s.r.o. /Final client: Moravský lihovar Kojetín a.s.
Equipment and performance: Aeration of decarbonisation water / aeration tower – removal of CO2 - 12 m3/h